Summary

Nairobi is currently experiencing a lot of traffic congestion. The Nairobi Beltway is a project aim to build, maintain and operate a multi-lane facility that will interlink Nairobi’s suburbs and allow faster and safer travel times, by decongesting existing roads. This will be an express road with minimal entries and exits for seamless flow of traffic that results in sustainable forms of public transport systems that include Bus Rapid Transit (BRT), greater traffic capacities etc. The project is structured as a PPP requiring an investment of KSh. 215 billion for operations of 35 years to recoup the investments and profit

Infrastructure

Infrastructure

Public Private Partnership

215000000000

KES

Sites identified

Nairobi and its outer regions