Summary

Phase 1: Construction of a Manufacturing plant that will be filling/sealing IV fluids at a nominal capacity of 1250 bags per hour (3.250.000 bags per year in 1 shift, 6.500.000 in 2 shifts, 9.750.000 in 3 shifts). The plant will have an estimated efficiency of 80% for phase one. Phase 2: Installation of an additional line with a nominal capacity of 1250 bags per hour increasing our production capacity 2500 bags per hour (6.500.000 bags per year in 1 shift, 13.000.000 bags in 2 shifts, 19.500.000 in 3 shifts) and adding a line to produce 2500 empty bags in PP per hour starting from film. Incorporate a solar energy system and medical Liquid gases plant. The solar system will generate enough power to run the biomedical manufacturing plant and supplement electricity thereby reducing energy costs.

Energy

Energy

Equity Investment

30000000

USD

Sites identified

Nairobi