Summary

The Masinga Hydropower dam is the largest dam on Seven Forks cascade with a storage capacity of 1,560 million cubic meters and installed generation capacity of 40MW. The project entails increasing the reservoir storage capacity to enhance power generation. The feasibility study conducted recommended the option of raising the dam by 1.5Meters to a full supply level of 1058Meters above sea level.

Energy

Energy

Engineering Purchasing and Constructing

22400000

USD

Feasibility study

Embu and Machakos County