RAISING OF MASINGA HYDROPOWER DAM
Summary
The Masinga Hydropower dam is the largest dam on Seven Forks cascade with a storage capacity of 1,560 million cubic meters and installed generation capacity of 40MW. The project entails increasing the reservoir storage capacity to enhance power generation. The feasibility study conducted recommended the option of raising the dam by 1.5Meters to a full supply level of 1058Meters above sea level.
Energy
Energy
Engineering Purchasing and Constructing
22400000
USD
Feasibility study
Embu and Machakos County
organisation
KENGEN